MRO

Jet Aviation completes 1st 4C-Check on a Falcon 50 in the Middle East

Jet Aviation Dubai recently completed and successfully redelivered the region’s first 4C-Check on a Dassault Falcon 50. The inspection was combined with FMS upgrades, light cabin refurbishments and mandatory ADS-B implementation. In tandem, the company also redelivered a 144-Month Check on a G450 and a 192-Month Check on G-IV, both requiring extensive structural repairs. The company is currently performing a C-Check on a BBJ.

The 4C maintenance inspection on a Dassault Falcon 50 is a milestone maintenance event due 24 years after service entry that requires extensive removal and subsequent reinstallation of the aircraft’s structures and systems for detailed inspections. With this Falcon 4C inspection, the aircraft cabin was entirely stripped, the three engines were removed and sent to the Engine Shop, and the landing gear was replaced.

Share
.